title: Overcoming Bad Breaks With The REBEL Sensor®
description: "See how REBEL® Sensors provided real-time concrete strength data to support risk assessment and insurance validation for a bridge project, ensuring safety, efficiency, and financial protection. 🌉🔍 #SmartInfrastructure"
---

# Overcoming Bad Breaks With The REBEL Sensor®

![West (2) (Medium)](https://resources.wavelogix.tech/hs-fs/hubfs/Case%20Study/West%20(2)%20(Medium).jpg?width=1024&height=768&name=West%20(2)%20(Medium).jpg)

Industry

Concrete Construction

Challenge

The contractor was struggling with low flex beam strength and variance between cylinders and core samples.

Results

Cylinder 32-day Strength* = 5.2K psi 32-Day Core = 6.5K psi Sensor 32-Day Strength = 7.2k psi. Flex Beams measured <400psi. REBEL® Sensors were used to prove that the contractor’s results were acceptable, given low flex beam strength and variance between cylinder breaks and core samples.

Key Product

REBEL® Sensors

[ www.in.gov/indot/ ](https://www.in.gov/indot/)

$180K+

Replacement Cost of Bridge

$1.7K

REBEL® Sensor and Datalogger Cost

$178K+

Total Savings for the Project

 

 

## About the Project

28-day Target Strength= 4K psi cylinders and 550 psi flex beams

A bridge in Indiana on I-69

~ 90 yards of reinforced concrete

6 REBEL Sensors placed in the concrete

Cylinders taken at 1, 4, 7, 14, and 28 days

> The REBEL System was deployed, and real-time strength data was provided to prove the results were acceptable and that the bridge could be opened.

## The Results

Cylinder 32-day strength =5.2K psi

32-day core= 6.5K psi

Sensor 32-day strength = 7.2K psi

Flex Beams measured < 400 psi

![I69 Case Study Strength](https://resources.wavelogix.tech/hs-fs/hubfs/Case%20Study/I69%20Case%20Study%20Strength.png?width=540&height=415&name=I69%20Case%20Study%20Strength.png)

 

## Related case studies

[![](https://resources.wavelogix.tech/hs-fs/hubfs/Case%20Study/465_sensors_small%20(Medium).png?width=1037&height=1037&name=465_sensors_small%20(Medium).png)

Concrete Construction

### Using REBEL® Sensors for Payment When Breaks Fail

](https://resources.wavelogix.tech/case-studies/a-case-for-providing-early-payment-for-california-i-10-paving-project-with-rebel-sensors-) [![](https://resources.wavelogix.tech/hs-fs/hubfs/Case%20Study/screed2.jpg?width=2016&height=2016&name=screed2.jpg)

Concrete Construction

### Building Bridges Ahead of Schedule and Under Budget With REBEL® Sensors

](https://resources.wavelogix.tech/case-studies/a-case-for-optimizing-a-bridge-reopening-in-ohio-using-rebel-sensors) [![](https://resources.wavelogix.tech/hs-fs/hubfs/Case%20Study/20230815_023708217_iOS%20(Medium).png?width=1024&height=1024&name=20230815_023708217_iOS%20(Medium).png)

Concrete Construction

### Opening Traffic Early With REBEL® Sensors

](https://resources.wavelogix.tech/case-studies/a-case-for-creating-reopening-patching-project)